top of page

PROJECTS

Pictures of multi stage projects with various stages that were done . 

Click on a picture , it will stop , be enlarged and most pictures will show a description of the job or that particular stage of the job .

CIMG1685.JPG
CIMG1682.JPG

NEW LAUNDRY ROOM ADDITION

PORCH ENCLOSED WINDOW TAKEN OUT OPENING ENLARGED TO MAKE ENTRY WAY

CIMG1616.JPG
20180814_091943.jpg
20180815_102642_HDR.jpg
20180815_112710_HDR.jpg
20180827_121150.jpg

OLD WOOD SIDING DAMAGED FROM BROKEN DOWNSPOUTS , REPLACED WOOD , INSULATED , NEW SIDING INSTALLED . FIXED DOWNSPOUTS

20180713_120334_HDR.jpg
20180713_120332_HDR.jpg
20180713_120200_HDR.jpg

NEW DECK AND CONCRETE SIDEWALK

​

EXISTING SIDEWALK DEMO AND A NEW

​

EXTENSION ADDED AROUND DECK

​

ALL CONCRETE SHOWN WAS POURED

​

NEW

20180713_120236.jpg
20180713_120205_HDR.jpg
floor05.jpg

FLOORING

floor01.jpg
floor03.jpg

WINDOW DEMO , NEW DOOR INSTALLED . HARDWOOD CUSTOM SHELVES INSTALLED ON THE RIGHT .

CERAMIC TILE ENTRY INSTALLED

20181020_114358.jpg
20180905_090611.jpg

BEFORE

AFTER

20181017_090142.jpg
20181019_135604.jpg

SHELVES

TILE

20181020_152048.jpg

DOOR INSTALL FROM

OUTSIDE , HOLE WAS

CUT THROUGH WALL

NEW COMPOSITE DECK

NOTE RAMP IN FRONT OF DOOR , INSTEAD OF STEPS

20181008_160631_HDR.jpg
20180908_112031_HDR.jpg

WINDOW OUT

BEFORE DOOR

INSTALL

Complete demo of old wall due to water damage . Rebuilt wall and added bulkhead with lights , ventilation screen . Also added shelves , new chandelier and all new ceiling along with crown molding

1

2

STEP BY STEP CONSTRUCTION  ON A DECK PROJECT . BRACE EXISTING DECKS , DESIGN AND BUILD NEW DECKS  , RAMP , LANDING AND STEPS. ( FOR AN APARTMENT COMPLEX)

DROP CEILING

D.I.Y. PROJECT , SHOWED THE HOMEOWNER HOW TO SET THE CABINETS AND THEY FINISHED THE JOB

COMPLETE DEMO AND REBUILD OF BATHROOM WITH NEW SHOWER

IMG_20200208_124058809.jpg
IMG_20200409_133045_01.jpg
IMG_20200511_045622310.jpg
IMG_20200531_194301427.jpg
bottom of page