RAILING INSTALLED TO PASS HOME

INSPECTION

6X6 TIE WALL

ANY SIZE JOB

LARGE OR SMALL

JACKMAN

ENTERPRISES

412.773.0693

NEW  DECK  WITH  STEPS  AND CONCRETE

RETAINING WALL

3 PLANTERS BUILT INTO WALL

D.I.Y. PROJECT

HOMEOWNER NEEDED STEPS AND

DECK AROUND POOL TO MEET EXISTING 1ST STORY DECK . HE FIRED THE FIRST CONTRACTOR . WE MADE THE STEPS , ONE WITH FOUR STRINGERS PLUS ALL STRUCTURAL LUMBER AND SOME DECKING , HE FINISHED .  

TEMPORARY WOOD TREADS INSTALLED TO KEEP STRINGERS STURDY AND IN PLACE UNTIL HOMEOWNER COULD PLACE COMPOSITE DECKING

cut to make chevron pattern outline

OLD STEPS WERE UNSAFE

CUSTOMER WANTED UPGRADE

WITHOUT SPENDING A LOT OF MONEY

MANUFACTURED FLAGSTONE PATIO

CUSTOMER WANTED CHEVRON PATTERN

ON THE PERIMETER  OF THE PATIO

THE PATTERN ENCOMPASSES THE PATIO

 BUT IS NOT VISIBLE DUE TO THE ANGLE OF 

THE PICTURE

Complete demo and rebuild of a failing retaining wall

Complete tear down of old wall , install new footer new drainage for wall and rebuild wall using original block and adding new matching block

Lightpoles Installed

Light poles installed from scratch . Used brick was used . The capstones were made from scratch . Each pole has a GFCI outlet installed in a weatherproof case . A timer control was installed to operate the entire system.

DECK CONSTRUCTED OVER PATIO 12 X 50

During construction photos

© 2023 by Lion Heavy Gear. Proudly created with Wix.com